New-build plumbing

Planned before it becomes permanent.

Complete residential plumbing infrastructure for homeowners, builders and contractors across Southern Manitoba.

Editorial view of organized plumbing in a residential new buildEditorial imagery

The best time to solve a plumbing detail is before the wall closes.

New-home plumbing depends on sequencing, clear decisions and coordination with the larger build. Twelve Stones works through the installation in stages, from early planning through fixture completion.

A simplified build sequence.

01PlanningReview the home, fixture approach and plumbing requirements.
02Rough-inEstablish the plumbing infrastructure at the right stage of construction.
03Water + drainageComplete the residential water and drainage systems within project scope.
04FixturesInstall specified fixtures and finish connections.
05TestingReview and test the completed plumbing work.
06CompletionClose out the scope and provide applicable support information.

Every project is different. Technical scope and responsibilities are confirmed for the specific build; certifications, products or services not stated here are not assumed.

Discuss a new build

Start a conversation

Have something in mind?